CTFL-001 受験記、ISTQB Certified Tester Foundation Level

ISQIのCTFL-001 受験記試験に参加するつもりの多くの受験生は就職しました。ほかのたくさんの受験生は生活の中でのことに挑戦しています。だから、我々は受験生の皆さんに一番効果的なISQIのCTFL-001 受験記復習方法を提供します。あなたは安心で我々の商品を購入できるために、我々は各バーションのISQIのCTFL-001 受験記復習資料のサンプルを提供してあなたに試させます。我々のISQIのCTFL-001 受験記復習資料を通して、いろいろな受験生はもうISQIのCTFL-001 受験記試験に合格しました。あなたは我々のソフトのメリットを感じられると希望します。

ShikenPASSの経験豊富な専門家チームはISQIのCTFL-001 受験記認定試験に向かって専門性の問題集を作って、とても受験生に合っています。ShikenPASSの商品はIT業界中で高品質で低価格で君の試験のために専門に研究したものでございます。

CTFL-001試験番号:CTFL-001
試験科目:「ISTQB Certified Tester Foundation Level」
一年間無料で問題集をアップデートするサービスを提供いたします
最近更新時間:2017-10-26
問題と解答:全300問 CTFL-001 教育資料

>> CTFL-001 教育資料

 

NO.1 When assembling a test team to work on an enhancement to an existing system, which of the
following has the highest level of test independence?
A. A business analyst who wrote the original requirements for the system.
B. A contract tester who has never worked for the organization before.
C. A permanent programmer who reviewed some of the new code, but has not written any of it.
D. A permanent tester who found most defects in the original system.
Answer: B

CTFL-001 感想   
Explanation:
In this scenario, the contract tester who has never worked for the organization before has the highest
level of test independence. The three others are less independent as they are likely to make
assumptions based on their previous knowledge of the requirements, code and general functionality
of the original system.
Note that independence does not necessarily equate to most useful. In practice most test or project
managers would recruit a permanent tester who has worked on the original system in preference to
a contract tester with no knowledge of the system. However, when assembling a team it would be
useful to have staff with varying levels of test independence and system knowledge.

NO.2 The development manager is managing the review of the responses received from bidders,
and has asked the in-house test manager to provide a review checklist for the test management
aspects of the responses. Which of the following checkpoints would be appropriate? 2 credits
A. The bidder's project strategy shows that the data content of all the test environments conforms to
EU standards.
B. The bidder's test plan shows that the application will be delivered for acceptance in six months
time.
C. The bidder's project test plan depicts a phased implementation with later delivery dates to be
confirmed and states that test deliverables will be developed using IEEE 829 as a guide.
D. The bidder's test policy should enforce that incident management fully conforms to IEEE 1044.
Answer: C

CTFL-001 技術者   

NO.3 Reviewing the test Basis is a part of which phase
A. Test Implementation and execution
B. Test Closure Activities
C. Test Analysis and Design
D. Evaluating exit criteria and reporting
Answer: C

CTFL-001 解説集   

NO.4 Which is not the fundamental test process?
A. Analysis and design
B. Test closure activities
C. None
D. Planning and control
Answer: C

CTFL-001 解答   CTFL-001 無料   

ShikenPASSは最新の1Z0-803試験問題集と高品質の1Y0-230認定試験の問題と回答を提供します。ShikenPASSの1z1-960 VCEテストエンジンと1Y0-202試験ガイドはあなたが一回で試験に合格するのを助けることができます。高品質の2V0-751トレーニング教材は、あなたがより迅速かつ簡単に試験に合格することを100%保証します。試験に合格して認証資格を取るのはそのような簡単なことです。

記事のリンク:http://www.shikenpass.com/CTFL-001-shiken.html